时间:2011-08-27 23:20来源:蓝天飞行翻译 作者:航空 点击:次
DODAR Diagnosis, Options, Decision, Assessment and Revision DOF Date of Flight (CFMU) DOI Domain Of Interest DOI Department of Industry DOP Dilution of Precision * DOP Daily Operations Plan DoR Domain of Responsibility DORA Directorate Operational Research and Analysis (UK) DOS Disk Operating System DOT Department of Transportation D-OTIS Data Link Operational Terminal Information Service DOTS Dynamic Ocean Tracking System * DOVE Data Link Operational Validation Exercise DP Data Processing DP Data Processing DP Discussion Paper DP&P Data Processing and Peripherals DPA Distinguishing Path Attribute * DPC Defence Planning Committee DPDG Diplomatic and Protocol Drafting Group DPE Digital Plot Extractor dpi dots per inch DPL Displayed Flight Plan DPL Deputy Project Leader DPL Duplicate Plan DPM Delta-Plane Motorisé (FR) DPS Distributed Processing System DPS Data Processing System DPS Detailed Production Specification DPSADD-TF Data Processing Systems Architecture Description Document Task Force (ATD) DPSK Differential Phase Shift Keying DPT Dynamic Time-based Planning DQTS Data Quality Tool Set DR Disaster Recovery DR Dead Reckoning * DRA Defence Research Agency (UK) DRACAS Data Reporting And Corrective Action System DRAM Dynamic Random Access Memory DRC Dynamic Route Change Page 48
D
|