航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接某国有大型货运航空公司的737-300/-400机组使用手册翻译任务

时间:2012-05-18 08:48来源:蓝天飞行翻译 作者:航空 点击:


  Unpressurized Takeoff and Landing
   Takeoff
   Takeoff
   After Takeoff
   Landing
   Landing
  No Engine Bleed Takeoff and Landing
   Takeoff
   After Takeoff
   Landing
 3 Anti–Ice, Rain
  Anti–Ice Operation
  Rain Repellent Use (as installed)
  Window Heat System Tests
   Overheat Test
   Power Test - Airplanes with window heat ON lights
   Power Test - Airplanes with window heat OFF lights
 4 Automatic Flight
  Level Change Climb/Descent
  Vertical Speed (V/S) Climb/Descent
  Altitude Hold
  Heading Select
  VOR Navigation
  Instrument Approach using Vertical Speed (V/S) 
  Circling Approach
 5 Communications
  Aircraft Communication Addressing and Reporting System (ACARS)
   Pre-Departure Clearance
   Digital-Automatic Information Service
   Oceanic Clearances
   Weight and Balance
   Takeoff Data
  Cockpit Voice Recorder Test
 6 Electrical
  Electrical Power Up
  Electrical Power Down
  Standby Power Test
 7 Engines, APU
  Battery Start
  Engine Crossbleed Start
  High Altitude Airport Engine Start (above 8400 feet)
  PMC off Takeoff and Climb
  Starting with Ground Air Source (AC electrical power available)
 8 Fire Protection
  Fire and Overheat System Test with an Inoperative Loop
 10 Flight Instruments
  Altimeter Difference 
  QFE Operation
 11 Flight Management, Navigation - Tests
  Tests
   Transponder Test
   Weather Radar Test
  IRS
   Align Light(s) Flashing
   Fast Realignment
   High Latitude Alignment
   IRS Entries
   Inadvertent Selection of Attitude Mode (while on the ground)
 11 Flight Management, Navigation - FMC
  Flight Management
   Lateral Navigation Using the FMC/CDU
   Vertical Navigation Using the FMC/CDU
   Performance and Progress Functions of the FMC/CDU
   RTA Navigation Using the FMC/CDU
 12 Fuel
  Fuel Balancing
  Refueling
   Fuel Load Distribution
航空翻译 www.aviation.cn
本文链接地址:承接某国有大型货运航空公司的737-300/-400机组使用手册翻译任务