航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接某国有大型货运航空公司的737-300/-400机组使用手册翻译任务

时间:2012-05-18 08:48来源:蓝天飞行翻译 作者:航空 点击:


   Takeoff %N1 (20K Derate)
  Gear Down - 737-400
   220 KIAS Cruise Altitude Capability
   220 KIAS Cruise Control
   220 KIAS Enroute Fuel and Time
   Descent at 220 KIAS
   Holding
  Text
   Introduction
   General
    Takeoff Speeds
    V1(MCG)
    Clearway and Stopway V1 Adjustments
    Assumed Temperature Takeoff
    Stab Trim
    VREF
    Recommended Maneuvering Speeds
    Slush/Standing Water Takeoff
    Slippery Runway
    Anti-skid Inoperative
    Takeoff %N1 
    Assumed Temperature Reduced Thrust
    Max Climb %N1
    Go-around %N1
    Flight with Unreliable Airspeed / Turbulent Air Penetration
   All Engines
    Long Range Cruise Maximum Operating Altitude
    Long Range Cruise Control
    APU Operation During Flight
    Long Range Cruise Enroute Fuel and Time
    Long Range Cruise Wind-Altitude Trade
    Descent
    Holding
   Advisory Information
    Normal Configuration Landing Distance
    Non-Normal Configuration Landing Distance
    Recommended Brake Cooling Schedule
   Engine Inoperative
    Initial Max Continuous %N1 
   Max Continuous %N1
    Driftdown Speed/Level Off Altitude
    Driftdown/LRC Cruise Range Capability
    Long Range Cruise Altitude Capability
    Long Range Cruise Control
    APU Operation During Flight
    Long Range Cruise Diversion Fuel and Time
    Holding
   PMC Off
    Introduction
    Takeoff Weight Adjustment
    Takeoff Speed Adjustment
    Power Settings
   Gear Down
 Section 737-400 CFM56-3_23.5K KG FAA
  General
   Takeoff Speeds
   V1(MCG)
   Maximum Allowable Clearway
   Clearway and Stopway V1 Adjustments
   Stab Trim Setting 
航空翻译 www.aviation.cn
本文链接地址:承接某国有大型货运航空公司的737-300/-400机组使用手册翻译任务