航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接某国有大型货运航空公司的737-300/-400机组使用手册翻译任务

时间:2012-05-18 08:48来源:蓝天飞行翻译 作者:航空 点击:


   Maintenance Index Page
   Navigation Position
    FMC Position Update
    Navigation Performance (U7 and On)
   Lateral Navigation (LNAV)
    Waypoints
    EFIS Map Displays
   Vertical Navigation (VNAV)
    Speed/Altitude Restrictions
    Takeoff and Climb
    Cruise
    Descent
    Early Descent
    Approach (U7 and on)
    Go–Around (U6 and On)
    VNAV Cruise (Engine Out Above Eng Out Max Alt)
    Required Time of Arrival (RTA) 
   Data Entry Rules
    Altitude Entry
    Airspeed Entry
    Data Pairs
    Bearing Entry
    Plus/Minus Signs
  32 Flight Management Computer
   FMC Databases
   Thrust Management
    Reduced Thrust Takeoff
    Reduced Thrust Climb
   Fuel Monitoring
   Loss of FMC Electrical Power
   FMC Failure
   Software Exception Handling Logic
  40 FMC Preflight
   Introduction
   Preflight Page Sequence
    Page Entries and Sequence
    Supplementary Pages
   Initialization/Ident Pages
    Initialization/Reference Index Page 
    Identification Page
   Position Pages
    Position Initialization Page
    Position Reference Page
   Route/Departure Pages
    Route Page
    Departure/Arrival Index Page
    Departures Page
   Performance Pages
    Performance Initialization Page
    Performance Limits Page
    N1 LIMIT Page (Preflight, U10 and On)
   Takeoff Page 1
    Takeoff Reference Page
   Takeoff Page 2
    Takeoff Reference Page 2/2
  41 FMC Takeoff and Climb
   Introduction
   Takeoff Phase
   Climb Phase
   Climb Pages
    Climb Page 
    RTA Climb Page
    RTE LEGS Page
航空翻译 www.aviation.cn
本文链接地址:承接某国有大型货运航空公司的737-300/-400机组使用手册翻译任务