时间:2011-09-26 01:01来源:蓝天飞行翻译 作者:航空 点击:次
For airports with at least two operational navigational facilities, each providing a straight-in nonprecision approach procedure or a straight-in precision approach procedure to different, suitable runways. (However, when an airport is designated as an ER-OPS En Route Alternate Airport in these operations specifications, the approach procedures used must be to separate, suitable runways). A ceiling derived by adding 200 ft. to the higher Category I HAT of the two approaches used. A visibility derived by adding . sm to the higher authorized Category I landing minimum of the two approaches used. For airports with a published CAT II or CAT III approach, and at least two operational navigational facilities, each providing a straight-in precision approach procedure to different, suitable runways. (However, when an airport is designated as an ER-OPS En Route Alternate Airport in these operations specifications, the approach procedures used must be to separate, suitable runways).
2. 3.
DIGITALLY FAA SIGNED 9/14/04 11:17:17 AM 4. 5.
DIGITALLY INDUSTRY SIGNED 9/14/04 11:06:39 AM Calderone, John P.
|