航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

完成2019年6月13日版本湾流G650ER全套飞行手册翻译任务

时间:2019-08-26 11:52来源:蓝天飞行翻译公司 作者:公务机翻译 点击:


Maximum Fuel Tank Temperature
Engine Ignition Systems
Continuous (Airstart) Ignition
Engine Exhaust
Thrust Reversers
Engine Oil
Oil Inlet Temperature
Oil Pressure
Engine Starting
Starter Duty
Chapter 2A - Production Aircraft Systems
List Of Effective Pages
Production Aircraft Systems
Introduction
Dimensions and Areas, Major Component Locations
Principal Dimensions
Entrances, Exits and External Doors
Flight Crew Station Components
Air Conditioning
Airflow and Temperature Control System
Pressurization Control System
Communications
Audio Panels System
Voice Communication System
MCDU and CCD Radio Tuning System
Selective Calling System (SELCAL)
Cockpit Voice Recorder System
Emergency Locator Transmitter System
FANS 1/A CPDLC/ADS-C
Electrical Power
AC Electrical Power System
DC Electrical Power System
Secondary Power Distribution System (SPDS)
Fire Protection
Engine and Auxiliary Power Unit (APU) Fire and Overheat Detection and Warning System
Engine and APU Fire Extinguishers
Aircraft Interior Overheat and Smoke Detection, Smoke Evacuation, and Portable and Fixed Fire Extinguishers
Emergency Vision Assurance System (EVAS)
Flight Controls
Aileron and Roll Spoiler Control System
Rudder Control System
Elevator Control System
Horizontal Stabilizer System
Wing Flaps System
Speed Brake and Ground Spoilers System
Fuel
Wing Fuel Tanks System
Fuel Distribution System
Fuel State Indication
Hydraulics
Left Hydraulic System
Right Hydraulic System
Ice and Rain Protection
Ice Detection System
Cowl Anti-Ice System
Wing Anti-Ice System
Windshield and Window Ice Protection and Rain Removal Systems
Indicating / Recording
Cockpit Clock System
Digital Flight Data Recorder System
Data LAN Management Unit
Cockpit Printer
Central Maintenance Computer (CMC) System
Monitor and Warning System
Electronic Display System
Maximum Vertical Acceleration Reporting System
Aircraft Health and Trend Monitoring System (AHTMS)
Landing Gear
Landing Gear and Doors System
Extension and Retraction System
Wheels and Brakes System
Nose Wheel Steering System
Tire Pressure Monitoring System
Lighting
Flight Compartment Lighting System
Passenger Cabin Lighted Signs and Icons
Baggage, Tail Compartment, Pylon and Service Panel Lighting
Exterior Lighting System
Emergency Lighting System
Navigation
Navigation Systems
Flight Environment Data System
Standby Multifunction Controller (SMC) System
Head Up Display (HUD) II System
Enhanced Vision System (EVS) II
Oxygen
Passenger and Crew Oxygen System
Pneumatics
Pneumatic System Control and Indication
Water / Waste System
Pressurized Water System
System Heating
Water Drain System
Vacuum Waste System
APU
Auxiliary Power Unit (APU) General
APU Mechanical Assembly
APU Control and Operation
Doors
Main Entrance Door
Emergency Exits
Baggage Compartment Doors
Tail Compartment Door
Service Doors
Security System
Powerplant
General Arrangement
Nacelle Arrangement
Mechanical Accessories
Engine Fuel and Control
Engine Fuel System
Engine Ignition
Engine Ignition System
Engine Controls
Electronic Engine Control System
Engine Thrust Management System
Engine Indication
Engine Indication System
Engine Exhaust
Thrust Reverser System
Engine Oil
Engine Oil System
Engine Starting
Engine Starting System
Chapter 03 - Expanded Normal Procedures
List Of Effective Pages
Expanded Normal Procedures
Introduction
Preflight Procedures
Cockpit Preflight Inspection
Exterior Preflight Inspection
Interior Preflight Inspection
APU Ground Operation
APU Start
APU Start Abort
APU Shutdown
Engine Starting Procedures
FMS Position Initialization Prior To Start
Before Starting Engines
Before Starting Engines - Thruflight
Normal Engine Ground Start
Power-Up Anomalies
Before Takeoff Procedures
After Starting Engines
Taxi / Before Takeoff
Line Up
Inflight Procedures
Climb
Cruise
Descent
In Range
Before Landing
EGPWS Alerts
All Engines Operating Go-Around Procedure
Heated Fuel Return System (HFRS)
P-RNAV (Precision RNAV) Procedures
Single Engine Taxi
Cold Weather Altimeter Setting Procedures
RNAV / RNP Approach Procedures
After Landing Procedures
After Landing
Shutdown
Postflight
Securing
Traffic Pattern Procedures
Traffic Pattern
Alternate Normal Procedures
Alternate Engine Ground Start
Cold Weather Start And Operation
External Air Start
Crossbleed Start
航空翻译 www.aviation.cn
本文链接地址:完成2019年6月13日版本湾流G650ER全套飞行手册翻译任务