航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接南山公务机公司的达索猎鹰7X公务机全套飞行手册翻译任务

时间:2012-06-15 13:08来源:蓝天飞行翻译 作者:航空 点击:

                     Landing distance; Landing speed; Climb speed schedule

              MINIMUM TURN AROUND TIME

                     Use of charts; Examples

                     Landing brake energy; Rejected take-off brake energy; Brake cooling time

              NOISE

                     Noise levels

                            ICAO ANNEX 16, VOL 1, REQUIREMENTS

                            PERFORMANCE CONDITIONS FOR NOISE LEVELS

                     Noise levels (US registered A/C)

                            FAR PART 36 REQUIREMENTS

                            PERFORMANCE CONDITIONS FOR NOISE LEVELS

                     Noise levels (BRAZILIAN registered A/C)

                            FAR PART 36 REQUIREMENTS

                            PERFORMANCE CONDITIONS FOR NOISE LEVELS

                     Noise levels (IAC/AR registered A/C)

                            AVIATION REGULATION PART 36 REQUIREMENTS

       LIST OF ANNEXES

              ANNEX 1 - AUTOPILOT APPROACH CAT II 

                     AUTOPILOT CAT II INTRODUCTION

                     AUTOPILOT CAT II LIMITATIONS

                     AUTOPILOT CAT II ABNORMAL

                     AUTOPILOT CAT II NORMAL

                     AUTOPILOT CAT II PERFORMANCE

              ANNEX 2 - CONTAMINATED RUNWAY OPERATION

                     Part 0: Table of contents

                     Part 1: Limitations, Abnormal and Normal procedures

                            INTRODUCTION

航空翻译 www.aviation.cn
本文链接地址:承接南山公务机公司的达索猎鹰7X公务机全套飞行手册翻译任务