航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接南山公务机公司的达索猎鹰7X公务机全套飞行手册翻译任务

时间:2012-06-15 13:08来源:蓝天飞行翻译 作者:航空 点击:

                     Definition of note, caution and warning

                     Definition of symbols

              LIST OF ABBREVIATIONS

                     List of abbreviations

              REVISIONS

                     LIST OF AFM REVISIONS

              EFFECTIVE SUB-SUB-SECTIONS

                     PREAMBLE TO THE LIST OF EFFECTIVE SUB-SUB-SECTIONS

                     LIST OF EFFECTIVE SUB-SUB-SECTIONS

              SERVICE BULLETINS AND OPTIONS

                     Summary of the service bulletins, options and modifications quoted in the Manual (for information)

                            MODIFICATIONS CONSIDERED

                            OPTIONAL DEVICES CONSIDERED

       SECTION 1 – LIMITATIONS

              GENERAL

                     Table of contents

              WEIGHTS AND LOADING 

                     Weights

                     Center of gravity limits

                     Loading

              AIRSPEED, MACH AND LOAD FACTORS

                     Operational limitations (A/C with M580)

                            TEMPERATURE AND ALTITUDE LIMITS

                            CROSSWIND AT TAKE-OFF

                            CROSSWIND AT LANDING

                            TAKE OFF AND LANDING

                            EN ROUTE

航空翻译 www.aviation.cn
本文链接地址:承接南山公务机公司的达索猎鹰7X公务机全套飞行手册翻译任务