航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接南山公务机公司的达索猎鹰7X公务机全套飞行手册翻译任务

时间:2012-06-15 13:08来源:蓝天飞行翻译 作者:航空 点击:

              25-40 Steep approach landing

                     STEEP APPROACH LANDING FROM 4.5 DEGREES TO 6.0 DEGREES

                     LIMITATIONS

                     STEEP APPROACH OPERATION

                     NORMAL PROCEDURES

                     ABNORMAL PROCEDURES

                     EMERGENCY PROCEDURE - OPERATING TECHNIQUES

                     PERFORMANCE

              25-42 Landing and take-off between 8,000 ft and 14,000 ft

              25-85 Push-back operations

       30 SPECIAL PROCEDURES - SYSTEM

              30-05 Use of thrust reverser to back up airplane

              30-10 Use of Emergency Vision Assurance System (EVAS)

              30-15 Ground air cart start and X bleed start

                     GROUND AIR CART START FOLLOWED BY X BLEED START

                     GROUND AIR CART START ON ALL ENGINES

                     X BLEED START

              30-25 FHDB download

CODDE3 - Operations Manual QRH 1 (BOOK 2)

       50 PERFORMANCE

              50-02 TOLD User guide

                     FMW / TAKE OFF AND LANDING DATA (TOLD)

              50-05 General 

                     INTERNATIONAL STANDARD ATMOSPHERE

                     PRESSURE

              50-10 Take-off

              50-15 Cruise - Maximum weight for maximum cruise altitude

              50-16 Cruise - Long range cruise

              50-17 Cruise - MI 0.80

              50-18 Cruise - MI 0.85

              50-19 Cruise - Maximum Cruise Thrust

              50-20 Holding

              50-25 Landing

航空翻译 www.aviation.cn
本文链接地址:承接南山公务机公司的达索猎鹰7X公务机全套飞行手册翻译任务