航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

蓝天飞行翻译公司完成波音737放行偏离指南DDG翻译任务

时间:2017-08-16 10:51来源:蓝天飞行翻译公司 作者:民航翻译 点击:


23-20-02-02A    One Handset Required
23-20-02-02B    Courier/Supernumerary Compartment Remains Unoccupied
23-21    Electronic Visual Surveillance Systems (All Installed Systems)
23-21A    Alternate Procedures Required
23-21B    Flight Deck Door Viewing Port Operates Normally
23-21C    Procedures Do Not Require Use
23-21-01    All Cargo Configuration
23-21-01A    Courier/Supernumerary Compartment Remains Empty
23-21-01B    Procedures Do Not Require Use
23-22    Electronic Voice Checklist
23-23    Multipurpose Interactive Display Unit (MIDU)
23-24    Landscape Camera System (-800EF STC ST02000NY)
23-24-01    Dome Camera
23-25    Automated Flight Information Reporting System (AFIRS) (STC’s ST10345SC and ST02361NY)
23-25A    Alternate Procedures Required
23-25B    Procedures Do Not Require Use
23-25-01    Global Voice SATCOM (ST02361NY)
23-25-01A    Alternate Procedures Required
23-25-01B    Procedures Do Not Require Use
23-25-01-01    Cockpit Dialer Pad
23-25-01-01A    Alternate Procedures Required
23-25-01-01B    Procedures Do Not Require Use
23-25-01-02    Flt. Compt. Handset
23-25-01-02A    Alternate Procedures Required
23-25-01-02B    Procedures Do Not Require Use
23-25-01-03    Pax. Compt. Handset
23-25-01-03A    Alternate Procedures Required
23-25-01-03B    Procedures Do Not Require Use
23-25-02    Global Messaging (ST02361NY)
23-25-02A    Alternate Procedures Required
23-25-02B    Procedures Do Not Require Use
23-26    Avionica secureLINK Airborne Wireless Router (STC03151AT)
23-27    Data Link Communications System
23-27A    Alternate Procedures Required
23-27B    Procedures Do Not Require Use
23-28    FWD and AFT Attendant Control Panel LCD Touch Screen Display, Display Processor and Display Processor Over-Temperature LED Light, Boeing Sky Interior (BSI) (-600/-700/-800/-900/-900ER)
ATA 24 - Electrical Power
24-01    Engine Driven Generator Systems
24-01-01    -100/-200/-300/-400/-500
24-01-01A    APU Fuel Heater Installed
24-01-01B    Fuel Temp Maintained at or Above 32 Degrees F (0 Degrees C)
24-01-02    -600/-700/-800/-900/-900ER
24-02    APU Generator System
24-03    Engine Driven Generator LOW OIL PRESSURE/DRIVE Lights
24-03-01    -100/-200/-300/-400/-500
24-03-02    -600/-700/-800/-900/-900ER
24-04    Engine Driven Generator Oil Temperature Indicator Systems (-100/-200/-300/-400/-500)
24-05    Engine Driven Generator HIGH OIL TEMP Lights (-100/-200/-300/-400/-500)
24-06    Transformer Rectifiers
24-06-01    No. 2 TR (-100/-200)
24-07    Frequency Meter
24-08    AC Volts Indication
24-08-01    Residual Voltage Function (-100/-200/-300/-400/-500)
24-09    AC Ammeters
24-10    Generator System Annunciator Panel (-100/-200/-300/-400/-500)
24-11    External Power System
24-11-01    DC Receptacle
24-12    GEN OFF BUS Lights
24-13    Galley Load Shed Sensor Module (-300/-400/-500)
航空翻译 www.aviation.cn
本文链接地址:蓝天飞行翻译公司完成波音737放行偏离指南DDG翻译任务