航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

蓝天飞行翻译公司完成达索猎鹰7X快速检查单翻译任务

时间:2020-08-27 15:29来源:蓝天飞行翻译公司 作者:公务机翻译 点击:


FMS-BASED APPROACHES
LOCALIZER-BASED APPROACHES
IRS
TCAS II SYSTEM OPERATION
EGPWS SYSTEM OPERATION
TOLD
VIDEO WINDOW (OPTIONAL)
ROCKWELL COLLINS HEAD-UP GUIDANCE SYSTEM (OPTIONAL)
RAAS (OPTIONAL) (M-OPT572)
SYNTHETIC VISION SYSTEM (OPTIONAL) (M-OPT638)
ATC DATA LINK (OPTIONAL) (A/C WITH M-OPT642 OR M-OPT652)
ATC DATA LINK (OPTIONAL) (A/C WITH M1970 AND (M-OPT642 OR M-OPT652))
ATA 49 - AUXILIARY POWER UNIT (APU)
ATA 52 - BAGGAGE COMPARTMENT - DOORS
PASSENGER DOOR MAXIMUM AUTHORIZED WEIGHT
BAGGAGE COMPARTMENT ACCESS DOOR IN CABIN
EXTERNAL BAGGAGE COMPARTMENT DOOR
ATA 70 - ENGINES
THRUST RATINGS (UNINSTALLED, SEA LEVEL, ISA)
THRUST SETTING
MAXIMUM ENGINE ROTOR SPEEDS : N1 AND N2
MAXIMUM INTERSTAGE TURBINE TEMPERATURE : ITT
STARTING TIME
WIND AT ENGINE START
ATA 78 - THRUST REVERSER
ATA 79 - OIL
OIL PRESSURE
OIL TEMPERATURE
APPROVED OILS
JEPPESEN CHART  (A/C with M-OPT0022)
JEPPESEN ELECTRONIC TERMINAL CHARTS (OPTIONAL)
JEPPESEN CHART  (A/C with M-OPT0022 and M-OPT0640)
DUAL JEPPESEN ELECTRONIC TERMINAL CHARTS (OPTIONAL)
NORMAL PROCEDURES
INTERIOR PREFLIGHT
EXTERIOR PREFLIGHT
POWER OFF
POWER ON
COCKPIT PREPARATION - BEFORE START
BEFORE START
START
STARTING PROBLEMS
AFTER START
TAXI
LINE-UP - TAKE-OFF
TAKE-OFF
AFTER TAKE OFF  (A/C with M1122 or SB 7X-300)
CLIMB
CRUISE
BEFORE DESCENT
DESCENT
,000FT (OR 10,000FT) DESCENDING
APPROACH
INSTRUMENT APPROACH
BEFORE LANDING
LANDING
GO AROUND  (A/C with M1122 or SB 7X-300)
AFTER LANDING
AT RAMP - SECURING THE AIRCRAFT
SECURING THE AIRCRAFT
NORMAL PROCEDURES - SYSTEM
ATA 23 - COMMUNICATIONS
ATA 34 - FLIGHT MANAGEMENT WINDOW / TEMPERATURE COMPENSATION  (A/C with M1122 (or SB 7X-300) or M1401 (or SB 7X-320) or M1341)
ATA 52 - NORMAL PROCEDURES
SPECIAL PROCEDURES - WEATHER
GROUND DE-ICING AND ANTI-ICING
OPERATIONS IN ICING CONDITIONS  (A/C with M1389 or SB 7X-287)
COLD WEATHER GROUND AND FLIGHT OPERATIONS
OPERATIONS ON CONTAMINATED RUNWAYS
DEFINITIONS
LIMITATIONS
NORMAL PROCEDURES
ABNORMAL PROCEDURES
PERFORMANCE
SEVERE TURBULENCE PENETRATION
WINDSHEAR RECOVERY
STRONG WIND OPERATIONS
CROSSWIND OPERATIONS
WEATHER RADAR AND LSS OPERATION
OPERATIONS IN CONTAMINATED AIRSPACE
SPECIAL PROCEDURES - OPERATIONS
PUSH-BACK OPERATIONS
PUSH-BACK OPERATIONS  (A/C with (M1417 or SB 7X-291))
LOW VISIBILITY TAKE-OFF (LVTO)
LIMITATIONS
NORMAL PROCEDURE
USE OF THRUST REVERSER TO BACK UP AIRPLANE
NOISE ABATEMENT DEPARTURE PROCEDURE - NADP 1 (CLOSE-IN)
DEFINITIONS
LIMITATIONS
BRIEFING
WINDOWING
NORMAL PROCEDURES
EMERGENCY AND ABNORMAL PROCEDURES
PERFORMANCE
NOISE ABATEMENT DEPARTURE PROCEDURE - DISTANT (OR NADP 2)
LIMITATIONS
BRIEFING
WINDOWING
NORMAL PROCEDURES
ABNORMAL PROCEDURES
NOISE ABATEMENT DEPARTURE PROCEDURE (NADP) - THRUST REDUCTION AT 1,500 FT AAL
LIMITATIONS
BRIEFING
NORMAL PROCEDURE
ABNORMAL AND EMERGENCY PROCEDURES
NOISE ABATEMENT DEPARTURE PROCEDURE - LONDON CITY AIRPORT ONLY
LIMITATIONS
BRIEFING
WINDOWING
NORMAL PROCEDURES
ABNORMAL PROCEDURES
RVSM
RNAV NAVIGATION
GENERAL
DEFINITIONS
LIMITATIONS
NORMAL PROCEDURES
ABNORMAL PROCEDURES
OPERATIONS IN OCEANIC AND REMOTE AREAS
RNP APPROACHES : RNP, RNAV (GNSS) OR RNAV (GPS)
GENERAL
RNP APPROACHES DOWN TO LNAV OR LNAV/VNAV MINIMA
RNP APPROACHES DOWN TO LPV MINIMA
AUTOPILOT APPROACH CAT II
LIMITATIONS
NORMAL PROCEDURES
ABNORMAL PROCEDURES
PERFORMANCE
STEEP APPROACH LANDING
STEEP APPROACH LANDING FROM 4.5 DEGREES TO 6.0 DEGREES
LIMITATIONS
STEEP APPROACH OPERATION
航空翻译 www.aviation.cn
本文链接地址:蓝天飞行翻译公司完成达索猎鹰7X快速检查单翻译任务