航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接金鹿公务机公司的达索猎鹰900飞机飞行手册翻译任务

时间:2014-02-25 11:46来源:蓝天飞行翻译 作者:航空 点击:


Table of contents
FLIGHT CONTROLS ( A/C with M5281 )
Stabilizer inoperative - Landing with elevator inoperative
STABILIZER INOPERATIVE
LANDING WITH ELEVATOR INOPERATIVE
FLIGHT CONTROLS (A/C with M5281 and M5360)
Stabilizer inoperative - Landing with elevator inoperative
STABILIZER INOPERATIVE
LANDING WITH ELEVATOR INOPERATIVE
FLIGHT CONTROLS ( A/C with M5281 )
Arthur unit inoperative
FLIGHT CONTROLS ( A/C with M5281 and M5360 )
Arthur unit inoperative
FLIGHT CONTROLS ( A/C with M5281 )
Slats / Flaps system malfunction
FLAP SYSTEM JAMMING OR ASYMMETRY
AUTO SLATS - UNWANTED SLAT EXTENSION
AUTO SLATS - SLAT MONITORING SYSTEM
Return landing above MLW (Final approach with SF 3)
RETURN LANDING ABOVE MLW (FINAL APPROACH WITH SF 3)
FUEL
Low fuel pressure
MASTER + GONG with FUEL PRESS 2 message in Crew Alerting System.
MASTER + GONG with FUEL PRESS 1 message in Crew Alerting System.
航空翻译 www.aviation.cn
本文链接地址:承接金鹿公务机公司的达索猎鹰900飞机飞行手册翻译任务