航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接顺丰航空公司的第6版波音737-300/400机组使用手册翻译任务

时间:2014-07-16 10:11来源:蓝天飞行翻译 作者:航空 点击:


Speed/Altitude Restrictions
Takeoff and Climb
Cruise
Descent
Early Descent
Approach
Go–Around
VNAV Cruise (Engine Out Above Eng Out Max Alt)
Required Time of Arrival (RTA)
Data Entry Rules
Altitude Entry
Airspeed Entry
Data Pairs
Bearing Entry
Plus/Minus Signs
Flight Management Computer
FMC Databases
Thrust Management
Reduced Thrust Takeoff
Derate/Variable Takeoff Rating
Reduced Thrust Climb
Fuel Monitoring
Loss of FMC Electrical Power
FMC Failure
Single FMC Installation
Dual FMC Installation
Software Exception Handling Logic
ACARS Data Link
ACARS Data Link
Data Link
Manual Downlinks
Automatic Downlinks
Uplinks
Long Delete Function
Requests
Request Status
FMC ACARS Uplinks (Accept/Reject)
FMC Data Link Uplinks (Load/Activate/Exec)
FMC Data Link Uplinks (Load/Exec–Erase)
航空翻译 www.aviation.cn
本文链接地址:承接顺丰航空公司的第6版波音737-300/400机组使用手册翻译任务