航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接庞巴迪挑战者605公务机机组操作手册飞机飞行手册快速检查单翻译任务

时间:2014-03-26 10:28来源:蓝天飞行翻译 作者:航空 点击:


Failure to Start
After Engine Start Check
Taxi Check
Stabilizer Trim Setting for Take-Off
Take-Off Check
After Take-Off Check
Climb Check
Cruise Check
Descent Check
In Range Check
Before Landing Check
After Landing Check
Shutdown Check
Securing Check
Battery/External Air – Engine Start
Cross-Bleed – Engine Start
External Air/AC Power – Engine Start
PERF-00 - PERFORMANCE CONTENTS
PERF-01 - Take-Off Data
Normal Take-Off – Sea Level
Normal Take-Off – 500 feet
Normal Take-Off – 1,000 feet
Normal Take-Off – 2,000 feet
Normal Take-Off – 4,000 feet
Normal Take-Off – 6,000 feet
Normal Take-Off – 8,000 feet
Normal Take-Off – 10,000 feet
Normal Take-Off – 12,000 feet
Normal Take-Off – 14,000 feet
PERF-02 - Climb Data
MAXIMUM CLIMB THRUST, % N1
Climb Data
PERF-03 - Cruise Data
Maximum Cruise Thrust, % N1
Cruise Data
Cruise Ceiling
PERF-04 - Sector Fuel data
Sector Fuel Range Data
PERF-05 - Descent Data
Descent Data
PERF-06 - Approach and Landing Data
Landing Speeds and Distances
Landing Speed and Distance Corrections
Go-around Thrust Setting, % N1
PERF-07 - Miscellaneous Data
Reserve Fuel (KG) – NBAA/IFR Format
Wind Component Conversion Table
PERF-08 - Single Engine Data
Driftdown Speed
Driftdown – Based on Driftdown Speed
High Speed Driftdown – MACH 0.72/260 KIAS
High Speed Driftdown – MACH 0.72/300 KIAS
SUPP-00 - Supplements SUPP-01 - Cold Wx Ops
Preparation for Deicing/Anti-Icing
Deicing/Anti-Icing
Deicing Fluid Holdover Time
SUPP-02 - Steep Approach
Steep Approach (5.5°) Landing Speeds and Distances
ALTITUDE - SEA LEVEL
航空翻译 www.aviation.cn
本文链接地址:承接庞巴迪挑战者605公务机机组操作手册飞机飞行手册快速检查单翻译任务