航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接庞巴迪挑战者605公务机机组操作手册飞机飞行手册快速检查单翻译任务

时间:2014-03-26 10:28来源:蓝天飞行翻译 作者:航空 点击:


After Take-Off
Landing
Auxiliary Power Unit
Auxiliary Power Unit
External Walkaround
Starting the APU on Ground or in Flight – First Start of the Day
Starting the APU on Ground or in Flight – Subsequent Starts
Stopping the APU
Automatic Flight Control System
Automatic Flight Control System
Yaw Dampers - Before Take-Off
Autopilot - After Take-Off
Autopilot - During Flight
AFCS - Before Landing
Doors
Doors
Passenger Door
Emergency Exits and Hatches (During Walkaround Inspection)
Electrical
Electrical
Before Normal APU Start
Before Normal Engine Start
After Starting Engines
Before Normal Engine Shutdown
Before Normal APU Shutdown
Electronic Flight Instruments
Electronic Flight Instruments
Clock – Before Starting Engines
Altimeters – Before Take-Off
Altimeters – Before Landing
Fire Protection System
Fire Protection System
Engine, Jetpipe and APU Fire Detection Systems Test – First Flight of the Day
Engine and APU Firex Monitor System Test – First Flight of the Day
Flight Controls
Flight Controls
Ground and Flight Spoilers, Before Take-Off – First Flight of the Day
Flight Controls Trim Systems, Before Flight – First Flight of the Day
Before Take-Off
During Flight
Navigation Systems
Flight Management System (FMS)
Prior to FMS Use
After Periods of Dead Reckoning (DR) Navigation
Inertial Reference System (IRS)
Before Starting Engines
Global Positioning System (GPS)
Before Starting Engines
Fuel
Fuel
External Walkaround
Before Starting Engines
After Starting One Engine – First Flight of the Day
Before Take-Off
During Cruise
Before Engine Shutdown – First Flight of the Day
After Engine Shutdown – Last Flight of the Day
航空翻译 www.aviation.cn
本文链接地址:承接庞巴迪挑战者605公务机机组操作手册飞机飞行手册快速检查单翻译任务