航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

完成2020年9月2日版本空客A320飞行机组技术手册翻译任务

时间:2020-10-30 08:36来源:蓝天飞行翻译公司 作者:民航翻译 点击:


Dual Hydraulic Failures
Remaining Systems
L/G
Landing with Abnormal L/G
Nose Wheel Steering Fault
Taxi with Deflated or Damaged Tires
Wheel Tire Damage Suspected
MISC
Cockpit Windshield/Window Cracked
EMER DESCENT
EMER EVAC
EMER LANDING
Flight Crew Incapacitation
Handling the Aircraft in the Case of Severe Damage
Low Energy
Overspeed
OVERWEIGHT LANDING
Rejected Takeoff
Stall Recovery
Volcanic Ash Encounter
Upset Prevention and Recovery
NAV
ADR/IRS FAULT
Unreliable Airspeed Indications
"Unreliable Speed Indication" QRH Procedure
Dual Radio Altimeter Failure
SMOKE
Preface
Smoke Detection and Procedure Application
Coordination with Cabin Crew
Smoke/Fumes/AVNCS Smoke QRH Procedure
Lithium Battery Fire in the Cockpit
Cargo Smoke
Preventing Identified Risks
Preliminary Pages
Table of Contents
Introduction
Risks related to Flight Phases
Risks related to System Operations/Failures
航空翻译 www.aviation.cn
本文链接地址:完成2020年9月2日版本空客A320飞行机组技术手册翻译任务