航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

当前位置: 主页 > 公司新闻 > 转版排版 >

完成CRJ700/900 飞行员参考手册转版任务 pdf转word

时间:2015-04-22 10:47来源:蓝天飞行翻译公司 作者:航空翻译 点击:


Flow Pattern
Landing
Normal Landing Profile
Reverse Thrust Operation
Crosswind Landing
Touch-and-Go Landing
Approach
Landing
Go-Around Procedure
After Landing Check
Shutdown Check
Flow Pattern
Terminating Check
Operation on Contaminated Runways
Distances
(1) Takeoff Distance
(2) Takeoff Run
Runway Conditions
(1) Runway Contaminated by Standing Water or Slush
(2) Runway Contaminated by Wet Snow
(3) Runway Contaminated by Dry Snow
(4) Runway Contaminated by Compacted Snow
(5) Runway Contaminated by Ice
Limitations
Recommendations
(1) Taxiing
(2) Takeoff
(3) Landing
Hydroplaning
Takeoff
Landing
Crosswind Landings
Use of Reverse Thrust
Performance
Cold Weather Operations
General
Definitions
Cold Weather Operations
Contaminants
Critical Surfaces
Comparative Analysis Procedure
Hold Over Time
Limitations
Airframe Contamination
Clean Aircraft Concept
Wet Aircraft and Temperatures >0°C (32°F) but <5°C (41°F)
Clear Ice Due to Cold Fuel
Frost Due to Cold Soaked Fuel
Frost on the Upper Surface of the Fuselage
Engine Contamination
Preflight Considerations
Preflight Preparation
External Safety Inspection
Cabin Preparation
Airframe Deicing, Anti-icing and Inspection
Deicing/Anti-icing Fluids
(1) Type I Fluids
(2) Type II and Type IV Fluids
(3) Type III Fluids
Infra-red Energy Deicing
Deicing/Anti-icing Procedures
(1) Mechanical Removal of Loose Contamination
(2) One-Step Deicing/Anti-icing
(3) Two-Step Deicing/Anti-icing
Removal of Loose Contamination
If significant amounts of loose snow are on the airplane:
If deicing/anti-icing is not planned:
If frozen contamination is found adhering to critical surfaces:
航空翻译 www.aviation.cn
本文链接地址:完成CRJ700/900 飞行员参考手册转版任务 pdf转word