航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

蓝天飞行翻译公司承接空客A319 A320飞机飞行手册翻译任务

时间:2014-03-25 11:04来源:蓝天飞行翻译 作者:航空 点击:


FUEL
Fuel and Additive Specifications
Usable Fuel
Fuel Imbalance
Fuel Temperature Limits
HYDRAULIC
Hydraulics Fluid
LANDING GEAR
Tire Speed
NAVIGATION
Inertial Reference System (IRS)
Reduced Vertical Separation Minimum (RVSM)
INFORMATION SYSTEMS
Airline Operation Control Applications
AUXILIARY POWER UNIT
Auxiliary Power Unit (APU)
POWER PLANT
Main Engines
Engine Parameters
Reverse Thrust
Oil
Reduced Thrust Takeoff
Operations in Icing Conditions
EMERGENCY PROCEDURES
Preliminary Pages
Table of Contents
GENERAL
INTRODUCTION
LANDING DISTANCE DETERMINATION IN CASE OF IN-FLIGHT FAILURE
FIRE/SMOKE
AIR COND/PRESS/VENT
CAB PR - EXCESS CAB ALT
CAB PR - EXCESS RESIDUAL PR
ELECTRICAL POWER
ELEC - EMER CONFIG (BOTH ENGINE GENERATORS FAILED)
FIRE/SMOKE
ENG 1 (2) FIRE (In Flight)
航空翻译 www.aviation.cn
本文链接地址:蓝天飞行翻译公司承接空客A319 A320飞机飞行手册翻译任务