航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

蓝天飞行翻译公司承接成都航空公司的九寨黄龙机场A319 B737 RNP AR手册翻译任务

时间:2013-05-07 17:07来源:蓝天飞行翻译 作者:航空 点击:


GPS Distance
GPS Distance
Position Fixing
Sources of GPS Inaccuracies
GPS Fault Detection and Exclusion
RNP Availability Forecast
Satellite Geometry
GPS Performance Prediction
GPS Performance Prediction
Naverus RNP Availability Forecast (NRAF)
Using the NRAFs
EPE or ANP
Monitoring EPE or ANP in Flight
      Normal Ops - A319 - A320 - A321 MASTER的主要内容包含有:

 

JiuZhai Huanglong Airport - Airbus A319, A320, A321 RNP AR Ground School
Teaching Overview
Overview - RNP Normal Operations
General RNP AR Operations Requirements
DISPATCH/PILOTS – Pilot qualification
Airbus Required Equipment for RNP Operations
DISPATCH Requirements
Navigation Data Base Requirements
DISPATCH - Navigation Data Base Requirements
Operational Documentation Requirements
GPS Predictive Capability
Required Navigation Performance Setting

航空翻译 www.aviation.cn
本文链接地址:蓝天飞行翻译公司承接成都航空公司的九寨黄龙机场A319 B737 RNP AR手册翻译任务