时间:2011-04-05 09:32来源:蓝天飞行翻译 作者:航空 点击:次
29 Handhold 手柄 30 Kick in step 脚蹬 31 Compressed gas bottles for inflation of forward floatation bages,choice of using nitrogen or helium供应前部气囊的压缩气瓶,可选氮气或氦气 32 Composite cabin floor 复合材料地板 33 Composite cabin interior side panels 复合材料客舱壁板 34 Cabin windows also available as push out windows客舱窗户,有可推出的窗户 35 50x70.75in cabin door which slides aft。 The rear part of the door slides into a slot in the forward part of the sponson向后滑动的客舱门,门后部滑入浮筒前面的缝隙里。 36 Escape panel in cabin door 客舱门护板 37 Emergency exit, two on Port side 紧急出口,左侧两个。 38 Compressed gas bottles for inflation of aft floatation bag, choice of using nitrogen or helium structure and general 供应后部气囊的压缩气瓶,可选氮气或氦气 39 Right hand sight glass for float bottle pressure压缩气瓶压力观察窗 40 Rear loading ramp, shown in down position。 Optional baggage shelf, bulkhead and nets which are accessible from the ramp are available (1,000lb maxlmum weight, 140ft3) 后部装载斜板,图示为放下位置。可选行李架、防水壁和网。 41 Rear fuselage of aluminium alloy with composite fairings。 铝合金后机身带复合材料整流罩 42 Composite fairings covering drive shaft to tail rotor 尾传动轴复合材料整流罩 43 Tail Structure of aluminium alloy with machined frames and composite fairings。 Built by Jingdezhen Helicopter Group' China 铝合金尾梁结构和复合材料整流罩,有中国景德镇直升机公司制造。 44 Fixed horizontal stabiliser of composite construction with machined spars 复合材料固定水平安定面, 45 Support strut for horizontal stabiliser 水平安定面支柱 46 Pull out maintenance steps 收放维护踏板 47 Removable composite leading edge fairing 可拆卸尾整流罩前缘 48 Removable composite trailing edge fairing 可拆卸尾整流罩后缘 49 Swiveling 2-axis hook,1O,O00lb capacity 2轴旋转吊钩,可挂10,000磅。 structure and general |