时间:2015-06-09 08:37来源:蓝天飞行翻译公司 作者:航空翻译
Remove the new proportional pressure reducing valve (item 2) from its package only right before installation. Cabin Heat Firewall Shutoff Control fuel totalizer seal brush Oxygen Supply Pressure barry safety barry Static Pressure Alternate Source Valve AIRFIELD SHALL REMAIN CLSD DUE VVIP MOV LDAapproach HRWS 备降到虹桥机场 备降虹桥机场 加入 机组 Maximum Demonstrated Crosswind Velocity Maximum Turbulent Air Penetration Speed llustrated 飞行关键阶段 raise cross instrumatation wider shape STRAP-JOINT omnidirection threshld snaps Identified on radar screen Identified on radar structure landing Full length runway uadrant friction uadrant friction lock iinterface power lever cleanup ream shut down GASKET, Rocker box cover 机位 停远机位 运行作业 合格数 准点 旅客交运行李 aspirator assembly 接替顺序 有氧舱 包装件 维修实验飞行 调剂飞行 domestic reserve domestic reserves a length 电台通信员 航空电台通信员 Cable screen 飞行机械员 glide slop ester-based ester-based oil VP ROP versa 装舱门 competent flight instruction 两点之间 衔接’ 机组对接 运行合格审定、 公共航空运输 Boost Switch Fuel Boost Switch 离港系统 值机 serial number specifics 拴挂联 loaded pump handle fcoc L/G level 跟踪处理 ranges 无主行李处理规定 无主物品 GEAR COVERS 双向阀 GEARS PINS GEARS PINS AND COVERS FCOMFCOM Hang-glider 接机时间 Para glider HANGGLIDER hydraulic volume certified configuration 阀部 密封片阀部 LDG pitch |