时间:2015-03-30 11:15来源:蓝天飞行翻译公司 作者:航空翻译
synthesized chronnmeter reflect the runway ptsn tap test condensation visible vdg THE AILERON LEVER POGO Saligned ADIR polular AVIONICS BAY catalytic effect pippen 地服保障 地服保障单位 hydraulic fluid leaks fluid leaks fulel duct-to-duct rrouter GENERATELASER Conditioned-Air Check Valves To Data circulate break conerntration thermal print head APU hours GS alive Aileons THE ELEVATOR TAB MAST FITTING LUGS THE MOUNTING DEVICE msp aviation f-loc bada lockslots AN END LOAD air/ground switch UPSTOPS European sky DPHM Domain DPHM Domains 格外注意 PRELOAD PAD THE PRELOAD PAD GSUPPORT CARRIAGE BEARING SUPPORT sbty The quasi-steady analysis presented in previous chapters determines the general bounds of the aircraft performance TRAILING EDGE FLAPSLINING corecell THE CEILING LINING relible 空防安全 is filed on There is no limit to the number of persons on the aircraft for the partial jacking mariginal Squib A Fault a build-up Don on mask 旅客信号牌 execution components Under rated altitude 前厕所灭火瓶到时限 Running checklist Mesh-wire adapt the speed adapt speed pad-ups operational capabilities the blast fence ATA100 sparwing multi-sparwing multi sparwing 马赫褶皱区 final approach fix inbound CTR`S CTRDPS least stability full/limited STOCKADJ altiiude simultaneous aproach maint manual A/C MAINT MANUAL A/C MAINT MANUAL REV aircraft status report mirabel production out boarding 链接片 edgefillet |