时间:2014-10-09 11:29来源:蓝天飞行翻译 作者:航空词典
probobility presented yoke trim ground crew call ARTEX ME406 Simulated Actual Equipment deterloration material flow system otg Worldlink Layout Freeze strength area a due point 备降 Special Detailed Inspections full-cab quadrature-axis voltage SWITCH HYDRAULIC FLUID TEMPERATURE electronics installations antennas Loop Resistance Test of Wire Bundle minorrepair minorrepaire minorepare testequipment APIS Submission wiring aircraft On-Site Acceptance Non-Zero Flight Time whirle off instructe instructed electric shift hot wet reference track electrics shift National Pipe Taper Site Preparation Guide seat security video downlink proximity warning Multi Crew Co-operation Multi-Crew Co-operation eAPI kilograms force |