航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接湾流G450飞行运行操作信息增补翻译任务

时间:2014-07-04 11:57来源:蓝天飞行翻译 作者:航空 点击:


Required List of Equipment
RNP Management
GNSS Updating
Radio Updating
Approach Procedure Confirmation
Track Deviation Monitoring
System Crosscheck
Procedures with RF Legs
Temperature Compensation
Altimeter Setting
Altimeter Crosscheck
Non-Standard Climb Gradient
Engine-Out Procedures
Go-Around or Missed Approach
Contingency Procedures
NORMAL CHECKLIST PROCEDURES
In Range
All Engines Operating Go-Around Procedure
Training
INTRODUCTION
FLIGHT CREW TRAINING
PILOT QUALIFICATION TRAINING
GROUND TRAINING
General Concepts of RNP SAAAR Operation
FLIGHT TRAINING SEGMENTS
ASSESSMENT
Initial Assessment of RNP SAAAR Knowledge and Procedures
Recurrent Training of RNP SAAAR Knowledge and Procedures
RNP MONITORING PROGRAM
 

180 Minute Distances (Non-ETOPS) for FAA Part 135 Operators

Pushback Operations With Engines Running or Not Running

航空翻译 www.aviation.cn
本文链接地址:承接湾流G450飞行运行操作信息增补翻译任务