时间:2012-10-28 10:52来源:蓝天飞行翻译 作者:航空 点击:次
53-43 - Longeron Station 155.00 to Station 217.84, Floor, Baggage Compartment and Longeron, Lower Installations 53-44 - Support Installation, Anti-torque, Boosted 53-45 - Frame Installation, Station 167.33 53-46 - Frame Installation, Station 179.66 53-47 - Frame Installation, Station 192.00 53-48 - Frame Installation, Station 204.92 53-49 - Frame Installation, Station 217.84 53-50 - Frame Installation, Station 231.47 53-51 - Stabilizer Installation, Horizontal 53-52 - Tailboom and Empennage Installation 53-53 - Tailboom and Empennage Installation 53-54 - Tailboom Assembly 53-55 - Tailboom and Empennage Installation (Fin Assembly) 53-56 - Fairing Installation, Tail Rotor Gearbox 53-57 - Drain Installation, Aft Fuselage 53-58 - Drain Installation, Aft Fuselage Chapter 62 - MAIN ROTOR 62-01 - Hub and Blade Installation, Main Rotor 62-02 - Blade Assembly, Main Rotor 62-03 - Hub Assembly, Main Rotor |